Newsroom

Media Resources

1 2 31080 1081 1082 1083 10841257
Showing 1081110820 of 12567 Items
Feb 24, 2005

Thomas F. Kline

Thomas F. Kline Sector Director, Quality Assurance Northrop Grumman Electronic Systems
Feb 21, 2005

USS Monitor Replica (DCS05-76-16)

Northrop Grumman Newport News employees will build the USS Monitor replica in 22 steel sections inside the shipyard's steel production facility. Pictured is the first section, called the keel unit, which weighs approximately 18 tons and is about the size of a rail car.
Feb 21, 2005

USS Monitor Replica (DCS05-76-2)

Northrop Grumman Newport News employee Josh Cantrell welds the keel section of the USS Monitor replica in preparation for a Mar. 6 keel laying ceremony.
1 2 31080 1081 1082 1083 10841257
Showing 1081110820 of 12567 Items

Social Media